Legal or procedural basis
Section 6, including the 3-metre depth test and 6-metre 45-degree test.

Assessment of foundations and excavations close to neighbouring structures under the statutory depth tests.
Extensions, basements, underpinning and deeper foundation projects.
Section 6 applies only when the statutory distance and depth tests are met. The three-metre test compares proposed excavation with the bottom of neighbouring foundations; the six-metre route also applies a 45-degree test.
Section 6, including the 3-metre depth test and 6-metre 45-degree test.
Extensions, basements, underpinning and deeper foundation projects.
The Act’s requirements and any boundary procedure depend on the actual documents, ownership and site relationships. These are the usual working stages.
Review the drawings, ownership interests, neighbouring structures and intended start date before deciding which notice route is relevant.
Describe the work accurately, attach the information required for that notice type and identify every owner who may need to be notified.
Serve the notice by an authorised method, retain evidence of service and track the statutory response and notice periods.
General information only. Advice on a particular property requires the relevant documents and facts.
No. For the three-metre route, the proposed excavation must also go below the bottom of the adjoining owner’s foundations. The levels must be assessed.
The Act requires plans and sections showing the site and depth of the excavation. The adjoining owner must also be told whether underpinning or other safeguarding is proposed.
These public sources support the general explanations on this page. They do not replace advice on the facts of a particular property.
Describe the work, notice or concern and tell us which drawings or documents you already have. You do not need to decide the statutory route before contacting the team.