Legal or procedural basis
Sections 2 and 6 may both apply; project-specific engineering evidence is important.

Specialist consideration of deep excavation, underpinning, temporary works and neighbour safeguards.
Owners and design teams planning deep excavation or foundation support work.
Basement and underpinning projects can engage both party-structure and adjacent-excavation provisions and usually require detailed temporary-works, sequencing and safeguarding information. Security for expenses and monitoring may also need reasoned consideration.
Sections 2 and 6 may both apply; project-specific engineering evidence is important.
Owners and design teams planning deep excavation or foundation support work.
The Act’s requirements and any boundary procedure depend on the actual documents, ownership and site relationships. These are the usual working stages.
Confirm the valid notice, appointments, drawings and matters that fall within the surveyors’ statutory jurisdiction.
Inspect relevant condition and review structural, sequencing, access and safeguarding information proportionately.
Record the authorised work and practical protections in an Award before the relevant work proceeds.
General information only. Advice on a particular property requires the relevant documents and facts.
The surveyors may need complete structural, geotechnical, temporary-works and sequencing information before safeguards can be settled proportionately.
No. It may be requested under section 12, but the amount and form depend on the project and evidence.
These public sources support the general explanations on this page. They do not replace advice on the facts of a particular property.
Describe the work, notice or concern and tell us which drawings or documents you already have. You do not need to decide the statutory route before contacting the team.